Thursday June 5: Today I went to the construction site with the design team for the first time. The road up to the site from the main road is terrible. It almost may be impassable if it rains (that will make it fun). The area is sparsely populated and was mostly used for gardening/farming and has a number of banana trees. Most of the site is flat enough for building without much concern, but there is a section on a hill that will make it challenging.
Several of the team members did a very detailed survey of the land while I helped make bore holes for soil samples and then checked the percolation rate at 2 of the bore holes (poured water in the holes for about a half hour to see how fast it drains to give an idea how the septic system will work with these soil conditions). In general there is about a foot of top soil then the farther down you go it gets rockier. I think at about 3 feet it is solid rock. Great for building, bad for septic system.
Even though we don't have too many neighbors at the site I got to know several of them a bit. They should make nice neighbors.
Tomorrow we will talk more about the placement of buildings on the site.