Friday, June 6: Today we met with the design team to talk about the layout of the buildings on the construction site. It seems tight but I think it will fit. The construction will be done in 3 or 4 phases, phase 1 starting ASAP.
We also talked about the use of a contractor. The way we do things in the west it would make sense, but it really drives up the costs. So, the plan is to find an experienced foreman for me to work with and we will do it together. This means a lot more hands-on work for me, and a lot to learn. I do have people I can turn to if needed.
Today I also looked at a house that we can rent, and will look at 2 or 3 more tomorrow. It would be great to know we had a place to live before arriving.
Mark